Augmented Ore Shaft

Revision as of 22:16, 28 January 2018 by Ramack02 (talk | contribs) (Fixed typo)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Revision as of 22:16, 28 January 2018 by Ramack02 (talk | contribs) (Fixed typo)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Augmented Ore Shaft
Information
cost 3,000
upkeep 40 per hour

ploppable Ore Mine
requirement OmegaCo HQ active in the region

Extraction division at an OmegaCo HQ active in the region

function Production rate : 480 tons/day
limit 4
description Rip that raw ore out of the ground faster than even before with this advanced ore shaft.




Coal Mine Coal Delivery Truck GarageCoal Shaft
Ore Mine Ore Delivery Truck GarageOre Shaft
Metals HQ Commerce DivisionEngineering DivisionSmelting Division
Smelting Factory Smelting Delivery Truck GarageMetal FurnaceAlloy Furnace
Advanced Coal Mine Heavy Coal Delivery Truck GarageAdvanced Coal Shaft