Heavy Rail Tracks

Revision as of 15:10, 11 March 2013 by Exibit03 (talk | contribs)

Revision as of 15:10, 11 March 2013 by Exibit03 (talk | contribs)

Heavy Rail Tracks
Heavy Rail Tracks
Information
cost 20

upkeep Free
requirement City Hall with
 Department of Transportation in region


•Existing rail line

function Supports the movement of Trains
description Tracks to connect the Passenger Train Station to the rail network or to connect up to a Freight Rail Terminal at a Trade Port.


Heavy Rail Tracks support the movement of trains. They can be constructed from an existing rail line.