Changes

Advanced Coal Mine

14 bytes removed, 15:27, 11 April 2013
no edit summary
| cost = 60,000

| upkeep = 400 per hour

| requirement = [[Mining Metals HQ]] with [[Engineering Division
]]
| function = Coal production rate: 96 tons per day

| module = [[Advanced Coal Mine Sign(advanced).jpg|Coal Mine Sign]], [[Heavy Coal Delivery Truck Garage]], [[Advanced Coal Shaft]]
| extra =
| description = Take advantage of recent metallurgical advancements and the repeal of certain environmental laws! Extract coal faster, from a larger area, with this powerful coal mine. This mine employs a massive number of workers and has a huge lot ready to be filled with coal.
==Modules==
===Coal Mine Sign===
[[Advanced Coal Min Mine Sign(Advanced)|Coal Mine Sign]]
===Heavy Coal Delivery Truck Garage===
[[Advanced Coal Shaft]]
[[Category: {{Mining]]}}
12
edits