Garbage Truck Garage

Revision as of 17:45, 13 March 2013 by Exibit03 (talk | contribs) (Created page with "{{module infobox | image = garbage truck garage.jpg | cost = §5,000
 | upkeep = §100 per hour | ploppable = Garbage Dump | requirement = | function = • Increases the...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Revision as of 17:45, 13 March 2013 by Exibit03 (talk | contribs) (Created page with "{{module infobox | image = garbage truck garage.jpg | cost = §5,000
 | upkeep = §100 per hour | ploppable = Garbage Dump | requirement = | function = • Increases the...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Garbage Truck Garage
Garbage Truck Garage
Information
cost §5,000

upkeep §100 per hour
ploppable Garbage Dump
function • Increases the speed of garbage collection

• Garbage capacity per vehicle: 1.5 tons

limit 8
description Add another garbage truck to your dump to speed up garbage collection.




Garbage Dump Service RoadGarbage Truck GarageDump ZoneGarbage Incinerator
Recycling Center Plastic Reclamation LineAlloy Reclamation LineMetal Reclamation Line
Recycling Collection Truck GarageReclamation Delivery Truck Garage