Advanced Coal Mine

Revision as of 05:53, 5 March 2013 by Planner (talk | contribs) (Created page with "{{ploppable infobox | image = | cost = 60,000
 | upkeep = 400 per hour
 | requirement = Mining HQ with Engineering Division
 | function = Coal production rate: ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Revision as of 05:53, 5 March 2013 by Planner (talk | contribs) (Created page with "{{ploppable infobox | image = | cost = 60,000
 | upkeep = 400 per hour
 | requirement = Mining HQ with Engineering Division
 | function = Coal production rate: ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Advanced Coal Mine
Information
cost 60,000

upkeep 400 per hour

requirement Mining HQ with Engineering Division

function Coal production rate: 96 tons per day

module Coal Mine Sign, Heavy Coal, Delivery Truck Garage, Advanced Coal Shaft
description Take advantage of recent metallurgical advancements and the repeal of certain environmental laws! Extract coal faster, from a larger area, with this powerful coal mine. This mine employs a massive number of workers and has a huge lot ready to be filled with coal.